Araby Blaisdell Rd over A"" Canal
9 miles SE of Yuma · County 027, Arizona · Built 1943 · 2 Lanes · 228 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.682583, -114.470361
This bridge is in worse condition than 36.6% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 83 years old.
Nearby Bridges
Avenue 9E over South Gila Canal
Built 1986
Avenue 9E over A Canal
Built 1981
I-8 WB over SR B8 & Canal
Built 1968
I-8; EB over SR B8 & Canal
Built 1968
30th Street over Gila Gravity Main Canal
Built 2006
US 95 over Gila Gravity Canal
Built 2022
Fortuna Rd over I-8
Built 1997
32nd Street over A Canal
Built 2002
I 8; WB over Fortuna SPRR
Built 1968
I 8; EB over Fortuna SPRR
Built 1968
Bridge Details
- Structure #
- 0304-0097
- Year Built
- 1943
- Length
- 11 m (36.1 ft)
- Max Span
- 4.7 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 228
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.