SR101L HOV Rmp over SR101L

4.4 miles N I-10 · County 013, Arizona · Built 2014 · 2 Lanes · 15,398 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
02928
Year Built
2014
Length
159.7 m (524 ft)
Max Span
10.7 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
15,398
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.