IRR 273 over Wetlands
Crescent Lk Dam · County 001, Arizona · Built 2009 · 2 Lanes · 514 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.917597, -109.425253
This bridge is in worse condition than 53.1% of bridges in County 001. The average bridge in Arizona is 0 years old; this one is 17 years old.
Bridge Details
- Structure #
- 02859
- Year Built
- 2009
- Length
- 75.9 m (249 ft)
- Max Span
- 25.6 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 514
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.