Chandler Blvd over I10 Ramps WN & SE

6.0 mi S Jct SR 60 · County 013, Arizona · Built 2003 · 9 Lanes · 38,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
02721
Year Built
2003
Length
97.8 m (320.9 ft)
Max Span
25.3 m
Width
39.1 m (128.3 ft)
Lanes
9
Daily Traffic
38,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.