US 93 over Hoover Dam Access Rd

64.4 mi NW Jct SR 68 · County 015, Arizona · Built 2010 · 4 Lanes · 17,763 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
02687
Year Built
2010
Length
42.7 m (140.1 ft)
Max Span
40.8 m
Width
27.2 m (89.2 ft)
Lanes
4
Daily Traffic
17,763
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.