Gilbert Road NB over Santan Freeway
Gilbert Rd / Santan · County 013, Arizona · Built 2004 · 9 Lanes · 17,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.2826, -111.7895
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 22 years old.
Nearby Bridges
Germann Road over Eastern Canal
Built 1996
SR 202 over Lindsay Rd/Eastern Canal
Built 2006
Cooper Road NB over Santan Freeway (202L)
Built 2005
Pecos Rd over Eastern Canal
Built 1976
Pecos Rd over Consolidated Canal
Built 1975
Germann Road over Consolidated Canal
Built 1985
SR 202L EB over Consolidated Canal
Built 2005
Cooper Road over Consolidated Canal
Built 1986
Chandler Blvd over Consolidated Canal
Built 1975
McQueen Road over Santan Freeway (202L)
Built 2005
Bridge Details
- Structure #
- 02670
- Year Built
- 2004
- Length
- 79.9 m (262.1 ft)
- Max Span
- 39 m
- Width
- 40.5 m (132.9 ft)
- Lanes
- 9
- Daily Traffic
- 17,300
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.