US 93 NB over Tompkins Canyon

29.1 mi S Jct I-40 · County 015, Arizona · Built 2008 · 2 Lanes · 4,989 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

34.7537, -113.6157

This bridge is in worse condition than 70.6% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 18 years old.

Nearby Bridges

Bridge Details

Structure #
02633
Year Built
2008
Length
22.6 m (74.1 ft)
Max Span
11 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
4,989
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.