US 93 NB over Big Sandy River

35.7 mi S Jct I-40 · County 015, Arizona · Built 1993 · 2 Lanes · 4,724 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 8 Very Good
Substructure 7 Good

Location

34.6628, -113.5807

This bridge is in worse condition than 78.8% of bridges in County 015. The average bridge in Arizona is 0 years old; this one is 33 years old.

Nearby Bridges

Bridge Details

Structure #
02355
Year Built
1993
Length
268.5 m (880.9 ft)
Max Span
38.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,724
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.