North-West Ramp over I 17; 101L; S Frntage Rd

3rd Level Center of TI · County 013, Arizona · Built 1997 · 2 Lanes · 14,369 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02167
Year Built
1997
Length
294.7 m (966.9 ft)
Max Span
54.9 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
14,369
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.