Toltec Road over I 10

4.7 mi E Jct I-8 · County 021, Arizona · Built 1989 · 5 Lanes · 3,034 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02152
Year Built
1989
Length
78.6 m (257.9 ft)
Max Span
40.2 m
Width
23.8 m (78.1 ft)
Lanes
5
Daily Traffic
3,034
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.