Kino Pkwy Ramp over Vegetated Ground

2.5 mi N of Jct I 10 · County 019, Arizona · Built 1993 · 2 Lanes · 2,103 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
02121
Year Built
1993
Length
118 m (387.1 ft)
Max Span
44.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
2,103
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.