SR 64 over Tappan Springs Canyon

1.0 mi W Jct US 89 · County 005, Arizona · Built 1993 · 2 Lanes · 2,080 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

35.8576, -111.4448

This bridge is in worse condition than 71.4% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 33 years old.

Nearby Bridges

Bridge Details

Structure #
02098
Year Built
1993
Length
42.7 m (140.1 ft)
Max Span
41.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
2,080
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.