Warner Road over I 10
3.8 mi South of Jct US 60 · County 013, Arizona · Built 1986 · 7 Lanes · 32,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.3344, -111.9726
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 40 years old.
Nearby Bridges
I 10; EB & WB over Wash
Built 1965
Warner Road over Drainage Canal
Built 1986
I 10; EB & WB over Wash
Built 1965
I 10; EB & WB over Wash
Built 1965
48th Street over Dry Wash
Built 1973
Ahwatukee Drive over Unnamed Wash
Built 1980
44TH STREET over Dry Wash
Built 1978
Ray Road over I 10
Built 1986
Elliot Road over I 10
Built 1992
51st Street over Dry Wash
Built 1982
Bridge Details
- Structure #
- 02016
- Year Built
- 1986
- Length
- 81.4 m (267.1 ft)
- Max Span
- 39.9 m
- Width
- 29.5 m (96.8 ft)
- Lanes
- 7
- Daily Traffic
- 32,600
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.