University Drive over I 10

3.41 mi W Jct US 60 · County 013, Arizona · Built 1986 · 6 Lanes · 35,180 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
02004
Year Built
1986
Reconstructed
1990
Length
82.3 m (270 ft)
Max Span
40.5 m
Width
30.2 m (99.1 ft)
Lanes
6
Daily Traffic
35,180
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.