IRR US 60 over Salt River
25.2 mi W Jct SR 73 · County 007, Arizona · Built 1993 · 2 Lanes · 3,004 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.7975, -110.5039
This bridge is in worse condition than 68% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 33 years old.
Bridge Details
- Structure #
- 01929
- Year Built
- 1993
- Length
- 115.5 m (378.9 ft)
- Max Span
- 56.7 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 2
- Daily Traffic
- 3,004
- Material
- Steel
- Design
- Arch - Deck
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.