SR 95 over Mockingbird Wash

23.8 mi S of Jct I 40 · County 015, Arizona · Built 1982 · 4 Lanes · 11,742 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
01915
Year Built
1982
Reconstructed
2004
Length
49.7 m (163.1 ft)
Max Span
10.7 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
11,742
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.