I 19; NB over Chavez Rd
17.1 mi N Jct SR 289 · County 023, Arizona · Built 1978 · 2 Lanes · 10,495 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.6526, -111.0594
This bridge is in worse condition than 65.7% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 48 years old.
Nearby Bridges
I 19; SB over Chavez Rd
Built 1978
I 19 over Wash
Built 1977
I 19 over Wash
Built 1978
I 19; W Frontage R over Wash
Built 1978
I 19; E Frontage R over Wash
Built 1978
Agua Linda Road over I 19; N&S
Built 1977
I 19 over Dry Wash
Built 1977
I 19; E Frontage R over Wash
Built 1978
I 19 over Wash
Built 1932
I 19; W Frontage R over Wash
Built 1978
Bridge Details
- Structure #
- 01877
- Year Built
- 1978
- Length
- 40.8 m (133.9 ft)
- Max Span
- 40.2 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 10,495
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.