107th Avenue over Papago W Drain Channel
300 ft N Jct I-10 · County 013, Arizona · Built 1982 · 5 Lanes · 18,690 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.4621, -112.2899
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 44 years old.
Nearby Bridges
I-10 (EB and WB) over 107th Avenue
Built 2009
Avondale Blvd over Papago W Drain Channel
Built 1982
Ramp S-W over Drainage CA/Rmp99C/99Av
Built 1998
I 10 over 99th Avenue
Built 1981
I 10 over Avondale Blvd
Built 1981
99th Avenue over Papago W Drain Channel
Built 1982
99th Ave over RID Canal
Built 1981
Ramp E - N over I 10 McDowell & Rp 99C
Built 1998
Ramp 91B over Ramp 99D
Built 1998
Loop 101 SB Ramp over RID Canal & McDowell Rd
Built 2000
Bridge Details
- Structure #
- 01818
- Year Built
- 1982
- Reconstructed
- 1994
- Length
- 24.7 m (81 ft)
- Max Span
- 23.8 m
- Width
- 33.3 m (109.3 ft)
- Lanes
- 5
- Daily Traffic
- 18,690
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.