Dobson Road over US 60

5.43 mi E Jct I 10 · County 013, Arizona · Built 1977 · 10 Lanes · 35,360 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01795
Year Built
1977
Length
69.2 m (227 ft)
Max Span
34.1 m
Width
42.9 m (140.7 ft)
Lanes
10
Daily Traffic
35,360
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.