US 95 over I-8

0.8 mi E Jct SR B8 · County 027, Arizona · Built 1970 · 8 Lanes · 35,771 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01380
Year Built
1970
Reconstructed
2010
Length
79.2 m (259.8 ft)
Max Span
40.2 m
Width
40.5 m (132.9 ft)
Lanes
8
Daily Traffic
35,771
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.