I-40 WB over SB 40

3.0 mi W Jct SR 77 · County 017, Arizona · Built 1969 · 2 Lanes · 21,131 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 4 Poor
Substructure 5 Fair

Location

34.9392, -110.1292

This bridge is in worse condition than 98.6% of bridges in County 017. The average bridge in Arizona is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
01370
Year Built
1969
Length
81.7 m (268 ft)
Max Span
30.5 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
21,131
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$240,000
Total Project Cost
$990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.