SR B 8 over I-8
3.8 mi E Jct SR 85 · County 013, Arizona · Built 1969 · 2 Lanes · 4,296 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.925692, -112.671408
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 57 years old.
Bridge Details
- Structure #
- 01345
- Year Built
- 1969
- Length
- 85.3 m (279.9 ft)
- Max Span
- 41.8 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,296
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.