IRR I 19; NB over Pima Mine Rd
6.4 mi N Jct B 19 · County 019, Arizona · Built 1968 · 2 Lanes · 20,297 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.001, -110.992
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 58 years old.
Nearby Bridges
IRR I 19; SB over Pima Mine Rd
Built 1969
I 19; NB & SB over Wash
Built 1968
I 19; NB over Wash
Built 1968
I 19; SB over Wash
Built 1968
IRR I 19; NB & SB over Wash
Built 1968
I 19; NB & SB over Wash
Built 1969
IRR I 19; NB & SB over Wash
Built 1968
Camino Rancheria over Wash
Built 2004
Camino Rancheria over Wash
Built 2004
IRR I 19; NB & SB over Wash
Built 1968
Bridge Details
- Structure #
- 01303
- Year Built
- 1968
- Length
- 60.4 m (198.2 ft)
- Max Span
- 18.6 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 20,297
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.