Stewart Rd over I-10

8.1 mi E Jct US 191 North · County 003, Arizona · Built 1968 · 2 Lanes · 363 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 7 Good

Location

32.3058, -109.7994

This bridge is in worse condition than 88.8% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
01228
Year Built
1968
Length
73.5 m (241.1 ft)
Max Span
36 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
363
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.