I 10; WB over Tucson Diversion Channel

2.4 mi E Jct I-19 · County 019, Arizona · Built 1966 · 3 Lanes · 39,551 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01110
Year Built
1966
Reconstructed
1987
Length
27.4 m (89.9 ft)
Max Span
25.9 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
39,551
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.