SR 82 over Sonoita Creek

12.6 mi SW Jct SR 83 · County 023, Arizona · Built 1964 · 2 Lanes · 2,234 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

31.5421, -110.7511

This bridge is in worse condition than 48.2% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
00804
Year Built
1964
Length
39.6 m (129.9 ft)
Max Span
10.7 m
Width
18.5 m (60.7 ft)
Lanes
2
Daily Traffic
2,234
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.