US 93 over Big Jim Wash

17.4 mi NW Jct SR 71 · County 025, Arizona · Built 1959 · 2 Lanes · 7,094 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00548
Year Built
1959
Length
61.6 m (202.1 ft)
Max Span
9.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
7,094
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.