SR 90; FAP 013 over Lewis Springs
7.3 mi E Jct SR 92 · County 003, Arizona · Built 1956 · 2 Lanes · 3,835 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
31.553, -110.1354
This bridge is in worse condition than 88.8% of bridges in County 003. The average bridge in Arizona is 0 years old; this one is 70 years old.
Nearby Bridges
SR 90 over San Pedro River
Built 2014
SR 90 over Wash
Built 1955
SR 90 over Wash
Built 1955
Schraeder Road over Drainage Channel
Built 1992
Charleston Road over San Pedro River
Built 1990
SR 90 over Wash
Built 1955
Avenida Del Sol over Wash
Built 1986
SR 80 over Government Draw
Built 1934
SR 80 over Wash
Built 1940
Ave Del Sol over PDS South Drainage
Built 1986
Bridge Details
- Structure #
- 00470
- Year Built
- 1956
- Length
- 34.4 m (112.9 ft)
- Max Span
- 12.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,835
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.