SR 82 over Comoro Canyon

8.4 mi E Jct B19 · County 023, Arizona · Built 1954 · 2 Lanes · 1,831 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

31.433, -110.8437

This bridge is in worse condition than 65.7% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 72 years old.

Nearby Bridges

Bridge Details

Structure #
00412
Year Built
1954
Length
34.1 m (111.9 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,831
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.