I 40; EB over RR RiordanRd. & Wash
4.5 mi West Jct I 17 · County 005, Arizona · Built 1950 · 2 Lanes · 12,435 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.1951, -111.7384
This bridge is in worse condition than 90.6% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 76 years old.
Nearby Bridges
I 40; WB over RR Riordan Rd & Wash
Built 1966
I-40 over Cross Rd A
Built 2022
I-40 over Cross Rd A
Built 2022
I 40 EB over Flagstaff Ranch Road
Built 1986
I 40; WB over Flagstaff Ranch Rd
Built 1986
Woody Mt Road over I 40; EB
Built 1965
Woody Mt Road over I 40; WB
Built 1966
Ramp E- S over 89A
Built 2000
I 40; EB over SR 89A
Built 1966
I 40; WB over SR 89A
Built 1965
Bridge Details
- Structure #
- 00332
- Year Built
- 1950
- Reconstructed
- 1986
- Length
- 148.4 m (486.9 ft)
- Max Span
- 21.3 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 12,435
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.