SR 79 over Brady Wash
20.3 mi North Jct SR 77 · County 021, Arizona · Built 1939 · 2 Lanes · 34 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.7733, -111.1608
This bridge is in worse condition than 93% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 87 years old.
Nearby Bridges
Bridge Details
- Structure #
- 00253
- Year Built
- 1939
- Length
- 53.6 m (175.9 ft)
- Max Span
- 7.6 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 34
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.