IRR BIA RTE N12 over TSAILE CREEK

1MI SE OF NAVAJO COMM COL · County 001, Arizona · Built 2022 · 2 Lanes · 2,600 vehicles/day

Overall
Good
Culvert
8
Very Good

Condition Ratings

ComponentRatingDescription
Culvert 8 Very Good

Location

36.281944, -109.176069

This bridge is in worse condition than 51.2% of bridges in County 001. The average bridge in Arizona is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
0000N35780B0505
Year Built
2022
Reconstructed
9999
Length
18 m (59.1 ft)
Max Span
18 m
Width
25.6 m (84 ft)
Lanes
2
Daily Traffic
2,600
Material
Prestressed Concrete
Design
Culvert
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.