IRR BIA RTE 6330 over BR COLORADO RIVER
0.1KM EAST OF RTE 6331 · County 005, Arizona · Built 2019 · 2 Lanes · 500 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
36.606539, -111.07435
This bridge is in worse condition than 53.2% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 7 years old.
Nearby Bridges
Bridge Details
- Structure #
- 0000N33780B0310
- Year Built
- 2019
- Reconstructed
- 9999
- Length
- 23.6 m (77.4 ft)
- Max Span
- 2.5 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.