IRR BIA RTE 3 over WASH

1.7 KM SE OF APACHE GOLD · County 007, Arizona · Built 1930 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 6 Satisfactory

Location

33.3505, -110.652306

This bridge is in worse condition than 68% of bridges in County 007. The average bridge in Arizona is 0 years old; this one is 96 years old.

Nearby Bridges

Bridge Details

Structure #
0000H58616B0838
Year Built
1930
Length
32.3 m (106 ft)
Max Span
8.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.