BIA IRR 3 over DRAW
0.8KM S OF JCT W/W VALENC · County 019, Arizona · Built 2011 · 2 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.1264, -111.081
This bridge is in worse condition than 69.1% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 15 years old.
Nearby Bridges
BIA IRR 3 over ROADSIDE DITCHES
Built 2011
Valencia Rd over Large Wash
Built 2014
S YOEM BO-OH over DRAINAGE DITCH
Built 1996
Valencia Rd over Black Wash
Built 2014
Camino Verde over Black Wash
Built 2007
Brightwater Way over Small Wash
Built 2004
Valencia Rd over Small Wash
Built 2012
Lemon Tree Dr over Small Wash
Built 2003
Valencia Rd over Small Wash
Built 2014
Tetakusim Rd over Small Wash
Built 2000
Bridge Details
- Structure #
- 0000H55665B0700
- Year Built
- 2011
- Length
- 10.7 m (35.1 ft)
- Max Span
- 3.3 m
- Width
- 21.2 m (69.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.