4010: HAEKEL ROAD over Upper San Simon Drainage

38 mi SE of Safford AZ · County 009, Arizona · Built 1974 · 2 Lanes · 50 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Culvert 6 Satisfactory

Location

32.468489, -109.398261

This bridge is in worse condition than 71.3% of bridges in County 009. The average bridge in Arizona is 0 years old; this one is 52 years old.

Nearby Bridges

Bridge Details

Structure #
0000000L2013860
Year Built
1974
Reconstructed
2019
Length
8.2 m (26.9 ft)
Max Span
1.1 m
Lanes
2
Daily Traffic
50
Material
Steel
Design
Culvert
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.