IRR BIA RTE N7 over NAZLINI WASH
ON ROUTE 7 IN CHINLE · County 001, Arizona · Built 1996 · 4 Lanes · 12,780 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.159489, -109.575503
This bridge is in worse condition than 64.3% of bridges in County 001. The average bridge in Arizona is 0 years old; this one is 30 years old.
Bridge Details
- Structure #
- 00000000000N546
- Year Built
- 1996
- Reconstructed
- 9999
- Length
- 79.3 m (260.2 ft)
- Max Span
- 26.2 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 12,780
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.