IRR BIA RTE N15 over DRY WASH
5 MI EAST OF SUNRISE · County 005, Arizona · Built 1979 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.308617, -110.91395
This bridge is in worse condition than 55.7% of bridges in County 005. The average bridge in Arizona is 0 years old; this one is 47 years old.
Bridge Details
- Structure #
- 00000000000N316
- Year Built
- 1979
- Length
- 30.6 m (100.4 ft)
- Max Span
- 11.5 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.