IRR BIA RTE N5045 over KIT SILI WASH
2.1 MI WEST OF TOLACON · County 001, Arizona · Built 1975 · 1 Lanes · 141 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
36.849144, -109.460886
This bridge is in worse condition than 84.5% of bridges in County 001. The average bridge in Arizona is 0 years old; this one is 51 years old.
Bridge Details
- Structure #
- 00000000000N230
- Year Built
- 1975
- Length
- 9 m (29.5 ft)
- Max Span
- 8.3 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 141
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $378,000
- Total Project Cost
- $548,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.