IRR BIA RTE 4 over ORAIBI WASH
23 KM NORTH OF HWY 264 · County 017, Arizona · Built 1979 · 2 Lanes · 165 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.040556, -110.476583
This bridge is in worse condition than 65.1% of bridges in County 017. The average bridge in Arizona is 0 years old; this one is 47 years old.
Nearby Bridges
Bridge Details
- Structure #
- 00000000000H220
- Year Built
- 1979
- Length
- 68.7 m (225.4 ft)
- Max Span
- 23.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 165
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.