IRR BIA RTE 3 over ACORN DRAW
29.6 KM E OF COOLIDGE DAM · County 009, Arizona · Built 1929 · 2 Lanes · 120 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
33.190972, -110.269361
This bridge is in worse condition than 96.1% of bridges in County 009. The average bridge in Arizona is 0 years old; this one is 97 years old.
Nearby Bridges
IRR BIA RTE 3 over WASH
Built 1929
IRR BIA RTE 3 over TWIN DRAW
Built 1929
IRR BIA RTE 3 over DEWEY FLAT DRAW
Built 1929
IRR BIA RTE 3 over BEE SPRING DRAW
Built 1929
IRR BIA RTE 3 over RAILROAD TRAIL WASH
Built 1929
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over GULCH
Built 1929
IRR BIA RTE 3 over J K GULCH
Built 1929
IRR BIA RTE 3 over CALVA DRAW
Built 1929
IRR BIA RTE 3 over GULCH
Built 1929
Bridge Details
- Structure #
- 00000000000H187
- Year Built
- 1929
- Length
- 24.4 m (80.1 ft)
- Max Span
- 11.9 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,073,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.