IRR BIA RTE 21 over MAIN DRAIN 17TH AVENUE
0.3 KM S OF BIA RTE 21/34 · County 012, Arizona · Built 1969 · 2 Lanes · 90 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.923125, -114.451089
This bridge is in worse condition than 87.6% of bridges in County 012. The average bridge in Arizona is 0 years old; this one is 57 years old.
Nearby Bridges
IRR BIA RTE 34 over MAIN DRAIN
Built 1963
IRR BIA RTE 38 over FIRST FEEDER NO 7 DRAIN
Built 1953
IRR BIA RTE 117 over SECOND FEEDER DRAIN
Built 1955
IRR BIA RTE 30 over MAIN DRAIN
Built 1963
IRR BIA RTE 30 over LATERAL CANAL NO 90
Built 1969
IRR BIA RTE 38 over USBR MAIN DRAIN
Built 1953
IRR BIA RTE 27 over WEST DRAIN
Built 1953
IRR BIA RTE 34 over WEST DRAIN
Built 1953
IRR BIA RTE 21 over LATERAL NO 90
Built 1969
IRR BIA RTE 44 over MAIN DRAIN
Built 1963
Bridge Details
- Structure #
- 00000000000H026
- Year Built
- 1969
- Length
- 23 m (75.5 ft)
- Max Span
- 7.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $104,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.