TOK CUTOFF over TOK RIVER OVERFLOW NO. 2
MILE POINT 102.4 · County 240, Alaska · Built 1963 · 2 Lanes · 330 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
63.118611, -143.3075
This bridge is in worse condition than 37.5% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 63 years old.
Bridge Details
- Structure #
- 4107
- Year Built
- 1963
- Length
- 7.9 m (25.9 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 330
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.