TOK CUTOFF over TOK RIVER

MILE POINT 101.5 · County 066, Alaska · Built 2016 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

63.042917, -143.370958

This bridge is in worse condition than 7.5% of bridges in County 066. The average bridge in Alaska is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
0663
Year Built
2016
Length
102.4 m (336 ft)
Max Span
34.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
330
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.