PARKS HIGHWAY over GOOSE CREEK

MILE POINT 58.0 · County 170, Alaska · Built 2023 · 2 Lanes · 2,650 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

62.061536, -150.060656

This bridge is in worse condition than 9.9% of bridges in County 170. The average bridge in Alaska is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
2343
Year Built
2023
Length
45.7 m (149.9 ft)
Max Span
44.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,650
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.