PARKS HIGHWAY over SHEEP CREEK
MILE POINT 53.7 · County 170, Alaska · Built 2023 · 2 Lanes · 2,650 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
61.995658, -150.047344
This bridge is in worse condition than 9.9% of bridges in County 170. The average bridge in Alaska is 0 years old; this one is 3 years old.
Bridge Details
- Structure #
- 0213
- Year Built
- 2023
- Length
- 71.3 m (233.9 ft)
- Max Span
- 34.6 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,650
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.