PARKS HIGHWAY over SUMMIT OVERHEAD

MILE POINT 168.8 · County 068, Alaska · Built 2006 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

63.342689, -149.087792

This bridge is in worse condition than 11.1% of bridges in County 068. The average bridge in Alaska is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
2084
Year Built
2006
Length
44.4 m (145.7 ft)
Max Span
41.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.