PARKS HIGHWAY over MIDDLE FORK CHULITNA RIV

MILE POINT 160.3 · County 170, Alaska · Built 2016 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

63.254767, -149.254506

This bridge is in worse condition than 14% of bridges in County 170. The average bridge in Alaska is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
0261
Year Built
2016
Length
110.6 m (362.9 ft)
Max Span
42.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.