3000000-23.95 over PERM

THORNE BAY · County 198, Alaska · Built 1985 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
100540000001074
Year Built
1985
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$124,000
Total Project Cost
$144,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.