3000000-23.23 over PERM

THORNE BAY · County 198, Alaska · Built 1985 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
100540000001073
Year Built
1985
Length
21.9 m (71.9 ft)
Max Span
21.3 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$164,000
Total Project Cost
$184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.